I have two heightfield erosion nodes acting on a heightfield input. On the first erosion node, I want to apply erosion until frame 10 on the timeline, and on the other, I want to erode until frame 25. To do this, I have to “lock” the first erosion node before calculating the second.
Now when I change the heightfield input, the erosion must be re-calculated. How do I do this?
Heightfield erosion. How to recook/update?
1637 3 1- soma wheels
- Member
- 27 posts
- Joined: Oct. 2015
- Offline
- soma wheels
- Member
- 27 posts
- Joined: Oct. 2015
- Offline
No one is answering, so I assume there is no built in solution for this? Thats very suprising.
Every time I change things that happen before the erosion in my node tree, I have to unlock and disconnect the erosion node, then reconnect it, then take it to frame one, then take it to the frame I want, then lock it again. When I have 4 erosion nodes in my tree this is a massive pain to do every time I make a small change to my heightfield input!
Every time I change things that happen before the erosion in my node tree, I have to unlock and disconnect the erosion node, then reconnect it, then take it to frame one, then take it to the frame I want, then lock it again. When I have 4 erosion nodes in my tree this is a massive pain to do every time I make a small change to my heightfield input!
Edited by soma wheels - Sept. 20, 2018 09:04:14
- daschatten
- Member
- 29 posts
- Joined: Sept. 2017
- Offline
- Andr
- Member
- 900 posts
- Joined: Feb. 2016
- Offline
-
- Quick Links