Any way to reorder guide process operations?

   863   2   2
User Avatar
Member
55 posts
Joined: April 2019
Offline
Often times it may be needed to reorder operations on a guide process, for example I have Set Length guide process in “set” mode and later I decide to add another operation in “multiply” mode, but now the “set” operation somewhat overrides the “multiply”, while I want the “multiply” one to function over the “set” one. I assume for this to work, their order has to get swapped. So, Is it possible to reorder the operations?

Thanks
VFX Supervisor | CG Artist

http://yasinhasanian.com/ [yasinhasanian.com]
User Avatar
Member
388 posts
Joined: Nov. 2016
Offline
I guess using a single operation per node and reordering the nodes would be the simplest way.
Edited by Tanto - April 18, 2019 18:15:07
User Avatar
Member
55 posts
Joined: April 2019
Offline
Yeah, I was doing that in the interim, however it would be pretty handy to be able to do this without having to create unnecessary nodes.
VFX Supervisor | CG Artist

http://yasinhasanian.com/ [yasinhasanian.com]