Often times it may be needed to reorder operations on a guide process, for example I have Set Length guide process in “set” mode and later I decide to add another operation in “multiply” mode, but now the “set” operation somewhat overrides the “multiply”, while I want the “multiply” one to function over the “set” one. I assume for this to work, their order has to get swapped. So, Is it possible to reorder the operations?
Thanks
Any way to reorder guide process operations?