Confused why unless I select my Pyro Import node when creating a Flipbook, I always end up re simulating. My display flags remain the same.
Inside my Pyro Import node I have a File node with a relative reference to my ROP geometry Output path inside my TOP network.
AFAIK, ‘correct’ behaviour is to simply load the cached files when I create a Flipbook, and not to re sim.
The only difference in the attached is that in one I have the TOP network node selected, while on the other the Pyro Import node is.
Anyone know why this is happening?