Hi,
Is there a way to submit a wedge TOP to simulate across multiple machines so that each simulation is happening on a single farm machine.
For example
- I have a wedge TOP that has a wedge count of 8, the wedge is processing a FLIP simulation. The wedge is connected to a ROP geometry output
- Currently, when this simulation goes to hqueue, a single machine is processing all 8 variations of the simulation, however it would be more efficient if it were broken up across the machines as the simulations take a long time. I also see this as an issue for large scale simulations that require a lot of memory, I wouldn't want one machine processing 8 simulations at once
- My hqueue scheduler “assign to” is set to any
Is there a way to tell the ROP geometry output how many simultaneous wedges it can process, and as a result move the remaining simulations to other machines?
Cheers,
Glenn