Hi, i'm trying to make a pipeline where you can switch your edit from a context to another (scene/sequence/project),
So i'm trying to use the EditTargetLayer Node but my first issue is that it does nothings as it is.
For exemple when we are inside the edits_in_context everything is fine, but we look at the layerReplace node, we see nothing.
and when saving, it does also nothing.
So I tried to replace the layerReplace with a merge node, it work almost as expected at the exception when using multiple EditTargetLayer to edit different layer, it save all edit in the last EditTargetLayer Node and does nothing on the other.
I'm sure it's because i don't use the node properly but i didn't find anyone explaning how to use it or any exemple scene for this node.
Does anyone have any tips on this subject?
thanks in advance.
Jeremy TAN
Edit Target Layer Node doesn't seem to work as expected
889 0 0-
- Shi00n
- Member
- 2 posts
- Joined: Dec. 2023
- Offline
-
- Quick Links
