Hi all.
I am struggling a bit with managing multithreading during the processing of the TOPs graph.
I have lots of light work that should run in parallel and the two steps that are memory intensive and need to run in sequence but on all cores.
Things I tried:
Creating new scheduler (set it to single only and the CPU or thread count to max) - this runs but never runs multithreaded.
Setting the FetchROPS to single only and the CPU or thread count to the max - this runs but never runs multithreaded.
Is there some magic to manage the CPU/count on a single work item? It always seems to be single-threaded.
Thank YOU!
Multi-threading: Single work Item
4562 8 0-
- Marti_M
- Member
- 11 posts
- Joined: 9月 2015
- オフライン
-
- BrookeA
- スタッフ
- 391 posts
- Joined: 8月 2017
- オフライン
-
- Marti_M
- Member
- 11 posts
- Joined: 9月 2015
- オフライン
-
- BrookeA
- スタッフ
- 391 posts
- Joined: 8月 2017
- オフライン
-
- Marti_M
- Member
- 11 posts
- Joined: 9月 2015
- オフライン
-
- BrookeA
- スタッフ
- 391 posts
- Joined: 8月 2017
- オフライン
-
- Marti_M
- Member
- 11 posts
- Joined: 9月 2015
- オフライン
-
- Marti_M
- Member
- 11 posts
- Joined: 9月 2015
- オフライン
-
- BrookeA
- スタッフ
- 391 posts
- Joined: 8月 2017
- オフライン
-
- Quick Links