Node Management : Moving SOP into a New Geo Node

   1858   2   2
User Avatar
Member
72 posts
Joined: 11月 2018
Offline
Hi,

I did not manage my nodes well from the very beginning, but now I progressed far far away from what I expected and I completed this project. The problem I have is that I am not able to create a digital asset because my nodes are not sorted under one Geo node, they are distributed and built around Geo node (File Node inside). How can I move all of the nodes including the geo node into a new Geo node ? I tried Copy Paste but it does not work, it does not paste the nodes inside the new level.
User Avatar
Member
2042 posts
Joined: 9月 2015
Offline
You can't copy a geo node into another geo node.

However, you can copy the contents of one geo node to inside another.

After doing that you will have to reset things like absolute node references.

Another option is you can use an object merge node inside a geo node to reference content of another geo.

You might want to post your hip if your having trouble figuring out a solution.
User Avatar
Member
72 posts
Joined: 11月 2018
Offline
Thx BabaJ. I managed getting SOP into Subnet node. Then I started to use it as hda.