Hey!
I'm hoping someone with experience in PDG can offer some guidance. I'm currently trying to use Deadline to render a series of wedges. My setup includes a Wedge node connected to a ROP Fetch (Redshift).
At the moment, when I cook the network, Deadline either creates a separate job for each frame or one job for all frames. However, what I’m aiming for is to have each wedge submitted as a separate job, specifically, 20 wedges with 240 frames each.
Any advice on how to achieve this setup would be greatly appreciated.
Cheers!
Help Rendering Wedges with Deadline as separate jobs
319 0 0-
- Mário Domingos
- Member
- 15 posts
- Joined: July 2013
- Offline
-
- Quick Links