Hi
Have switched to primarily using the TOPs ROP Geometry Output TOP for caching my simulations.
Was wondering if it is possibly to pause or cacnel a caching operation half way thru (Dirty Selected Node) and then continue later by re cooking the node (With changed starting frame in Frame range).
I have ‘All Frames in One batch’ selected under ROP Fetch tab.
When I attempt this however I am always stuck on the first frame-workitem when re-cooking the ROP geo Output node.
TOPs ROP Geometry Output - pausing and resuming cache