Hello,
Is it possible to assign specific nodes on an hqueue farm to specific tasks from a PDG tree? I want to be able to simulate on one machine and as resulting frames are simulated have another machine start rendering.
assign specific nodes to PDG tasks
2279 1 2-
- Eyecon
- Member
- 55 posts
- Joined: 11月 2015
- オフライン
-
- chrisgreb
- Member
- 603 posts
- Joined: 9月 2016
- オフライン
Yes, you do that with the “Select Clients” job parm on the Node.
https://www.sidefx.com/docs/houdini/tops/schedulers.html#override [www.sidefx.com]
https://www.sidefx.com/docs/houdini/tops/schedulers.html#override [www.sidefx.com]
-
- Quick Links

