Hello,
Is it possible to assign specific nodes on an hqueue farm to specific tasks from a PDG tree? I want to be able to simulate on one machine and as resulting frames are simulated have another machine start rendering.
assign specific nodes to PDG tasks
1397 1 2- Eyecon
- Member
- 55 posts
- Joined: Nov. 2015
- Offline
- chrisgreb
- Member
- 603 posts
- Joined: Sept. 2016
- Offline
Yes, you do that with the “Select Clients” job parm on the Node.
https://www.sidefx.com/docs/houdini/tops/schedulers.html#override [www.sidefx.com]
https://www.sidefx.com/docs/houdini/tops/schedulers.html#override [www.sidefx.com]
-
- Quick Links